Date Range
Date Range
Date Range
For Electrical Engineering Technology students at SAIT. Welcome to the Fall 2013 Semester! September 6, 2013.
WCW16 - Honouring The Full Circle. Participate in the 68th Annual WCW conference in Calgary Alberta October 4th to 7th. A robust list of paper submissions were received this year. Technical sessions include 2 special sessions and 3 round table discussions. Book your hotel room early to avoid disappointment.
Project Hosting for Open Source Software. By clicking Delete, all history, comments and attachments for this page will be deleted and cannot be restored. Opera does not support ClickOnce X. To install this application, save it and then open it. Opening it directly from Opera will not work correctly.
MPE has accelerated the multi-dimensional growth of brands in sports, entertainment, media, tech, and event production. By identifying entities with high growth potential and latent equity, MPE develops brand positioning and go to market strategies to accelerate enterprise value through expert management consulting, corporate alliances, calculated positioning execution, and cohesive social and digital infrastructure. Please enter a valid e-mail.
Balance cost and risk to achieve optimum asset performance. Established in 1997, we are based in New South Wales and Queensland, and operate internationally.
Karabuk RO UF Treatment Plant taken to Operation. Designed, Turnkey Built, taken to Operation by MPE, 45000m3 Plant is successfully Commissioned. Turnkey Designed and Constructed by MPE in 2008, operation and Management by MPE ongoing. Raysut Salalah WWTP, Turnkey Constructed by MPE Successfully taken to Operation. Plant Turnkey Design and Construction by MPE in 2009 Operated and Managed by MPE.